Justia U.S. Federal Circuit Court of Appeals Opinion Summaries
Blue Gentian, LLC v. Tristar Products, Inc.
Blue Gentian owns the asserted patents. Berardi, Blue Gentian’s principal was the sole named inventor on each patent. The utility patents generally relate to an expandable hose. The design patents claim the ornamental design for an expandable hose. Blue Gentian sued Tristar for infringement. Tristar counterclaimed to correct the inventorship of all six patents. After an evidentiary hearing, the district court determined that a nonparty, Ragner, should have been a named co-inventor on all asserted patents and entered judgment on the inventorship counterclaim, ordering correction of the patents under 35 U.S.C. 256.The Federal Circuit affirmed. The district court properly determined that the three key elements were a significant contribution to the conception of at least one claim of each asserted patent. To the extent the district court should have provided a more detailed claim-by-claim comparison of Ragner’s contributions, any error was harmless. The three elements, taken together, were a significant contribution to at least one claim of each asserted patent. Blue Gentian’s insistence that claim construction was a prerequisite to an inventorship hearing, without more, did not present a dispute about claim scope since it did not otherwise present a material dispute about claim meaning. View "Blue Gentian, LLC v. Tristar Products, Inc." on Justia Law
Posted in:
Intellectual Property, Patents
Yita LLC v. MacNeil IP LLC
MacNeil’s patents share a specification, covering a “vehicle floor tray . . . thermoformed from a polymer sheet of substantially uniform thickness.” The specification explains the need “for a floor tray that will have a more exact fit to the vehicle footwell” and “that stays in place once it is installed.”In inter partes reviews (IPRs) of challenges to all claims of the patents on obviousness grounds, the Patent Trial and Appeal Board rejected the challenges, concluding that—although a relevant artisan would have been motivated to combine, and had a reasonable expectation of success in combining, the teachings of the asserted prior-art references to arrive at each challenged claim—“[MacNeil’s] evidence of secondary considerations [was] compelling and indicative of non-obviousness.” The Federal Circuit reversed. The Board made a result-determinative legal error regarding MacNeil’s secondary-consideration evidence; the finding of secondary considerations lacks substantial-evidence support under the proper legal standard. View "Yita LLC v. MacNeil IP LLC" on Justia Law
Posted in:
Intellectual Property, Patents
Department of Transportation v. Eagle Peak Rock & Paving, Inc.
The Department of Transportation’s Federal Highway Administration (FHWA) contracted with Eagle for construction work in Yellowstone National Park, to be completed by October 2018. The contract required Eagle to submit a schedule detailing how it would complete the project on time. By late January 2017, FHWA had rejected Eagle’s eight formal schedule submissions as not complying with the contract. In February 2017, the contracting officer terminated the contract for default, concluding that Eagle was insufficiently likely to complete the project on time.Eagle challenged the termination for default under the Contract Disputes Act of 1978 (CDA), 41 U.S.C. 7101–7109, before the Civilian Board of Contract Appeals, which ruled that the termination for default was improper. The Board converted the termination to one for the convenience of the government, relying heavily, though not exclusively, on its view of deficiencies in the contracting officer’s reasoning, rather than on de novo findings about whether the record developed before the Board showed that standard for termination for default was met. The Federal Circuit vacated and remanded for the Board to adjudicate the case de novo. The Board’s evaluation of the contracting officer’s reasoning exceeded the limited scope of the threshold inquiry. The Board also failed to separate that threshold analysis from its de novo evaluation of the evidence. View "Department of Transportation v. Eagle Peak Rock & Paving, Inc." on Justia Law
Medtronic, Inc. v. Teleflex Innovations S.à.r.l.
For decades, cardiologists have used guide catheters to deliver interventional cardiology devices (e.g., guidewires, stents, balloon catheters) designed to alleviate stenoses. These procedures involved certain challenges and risks. Telex’s patents sought to address these problems by using a coaxial extension catheter insertable into standard guide catheters that offered increased backup support and the ability to deep seat without the attendant drawbacks of traditional systems.Medtronic petitioned for inter partes review (IPR), alleging the challenged claims would have been obvious over prior art. The Patent Trial and Appeal Board found certain claims unpatentable. The Federal Circuit affirmed. The Board did not err in determining Medtronic failed to carry its burden to show that certain claims would have been obvious, and substantial evidence supports its underlying findings of fact. The court also upheld the Board’s determination that Telex's proposed Substitute Claims had adequate written description support and would not have been obvious over Medtronic’s asserted grounds. View "Medtronic, Inc. v. Teleflex Innovations S.à.r.l." on Justia Law
Hampton v. McDonough
Hampton served in the Navy from 1985-1989. In 1997, she filed a claim for VA disability compensation for migraines. In 1998, the regional office (RO) increased Hampton’s rating to 30 percent, effective from 1997. In 1999, Hampton applied for a total disability rating based on individual unemployability (TDIU) effective from 1997 due to “migraine[s], bladder, [and] reflux.” The RO denied TDIU. Hampton never filed a notice of disagreement but filed a new claim for increased compensation based on migraines. This claim was denied in 1999; Hampton filed a notice of disagreement. In 2000, the Board affirmed the RO. In 2003, Hampton filed a new claim for increased compensation and a second TDIU application. The Board ultimately granted Hampton TDIU, effective from 2003. Hampton argued that her 1999 TDIU claim was still pending because she submitted additional evidence within the one-year appeal window but never received a determination. The Board denied entitlement to an earlier effective date, finding that the 1999 TDIU claim was not still pending when Hampton filed her 2003 claims.The Veterans Court and Federal Circuit affirmed; 38 CFR 3.156(b) does not require the VA to explicitly state whether submitted evidence is new and material to a claim, where that claim is implicitly denied after consideration of the evidence. The Board’s 2020 decision, by finding the 2000 decision an implicit denial of TDIU, was not making a new and material evidence determination in the first instance. The RO did so in 1999. View "Hampton v. McDonough" on Justia Law
Posted in:
Military Law, Public Benefits
City of Wilmington, Delaware v. United States
Wilmington charges its residential and non-residential property owners a stormwater management fee, based on an estimation of each property’s contribution to stormwater runoff. Because a precise measure of the actual amount of stormwater pollution from each property is impossible, the city devised a methodology for approximating the runoff attributable to each property based on recommendations from an engineering firm. For non-residential properties, the city assesses the fee based on a formula comprised of four variables. The U.S. Army Corps of Engineers (USACE) owns five properties in Wilmington, comprising 270 acres, classified as vacant, and used to store dredged material. USACE disputed whether the Clean Water Act (CWA), 33 U.S.C. 1323, waived its sovereign immunity with respect to this fee.The Federal Circuit affirmed a Claims Court holding that the fees are not reasonable service charges, allowable under the CWA. Wilmington did not explain how the vacant land use code corresponded to the runoff coefficients nor whether its stormwater class fairly captured variability in vacant parcels, given that only one parcel contains any paved surface. Wilmington’s methodology, as applied, led to charges that are not a fair approximation of the properties’ proportionate contribution to stormwater pollution. View "City of Wilmington, Delaware v. United States" on Justia Law
Posted in:
Environmental Law, Government & Administrative Law
Kelly v. United States
Kelly served as a Navy diver from 2008-2013 and received numerous accolades but suffered multiple injuries. Following a 2012 dive mission, Kelly received hyperbaric chamber treatment. Kelly then experienced emotional and behavioral changes. He was diagnosed with an adjustment disorder, depressed mood, and anxiety. In 2013, Kelly was cited for criminal incidents. The Navy removed Kelly’s diver classification. Kelly was discharged “Under Honorable Conditions (general).” The narrative recited “misconduct” for the commission of a “serious offense.” Based on the “liberal consideration” policy, the Discharge Review Board removed the reason for separation.Kelly subsequently requested that the Record Correction Board correct his military records to reflect disability retirement under 10 U.S.C. 1201. A Senior Medical Officer advisor opined that Kelly was fit to perform his duties at the time of his separation and that his misconduct did not result from “a legal[ly] exculpating level of psychological impairment incident to a potentially compensable psychiatric condition.” The Board denied Kelly’s request.The Federal Circuit vacated. The Board failed to evaluate all relevant criteria under Secretary of the Navy Instruction 1850.4E 3304 (common military tasks, physical readiness/fitness tests, deployability, special qualifications); failure to evaluate the effect the upgrade change in Kelly’s record had on his eligibility for retirement disability pay was arbitrary. The Board must determine whether Kelly’s medical condition affected his deployability or special qualifications. Section 1201 military disability retirement benefits are nondiscretionary and statutorily mandated; they confer a property interest protected by the Due Process Clause. View "Kelly v. United States" on Justia Law
Posted in:
Government & Administrative Law, Military Law
Medtronic, Inc. v. Teleflex Innovations S.À.R.L.
The challenged patents, owned by Teleflex, all descend from a common application filed in 2006, share a common specification, and are directed to guide extension catheters that use a tapered inner catheter that runs over a standard coronary guidewire to reduce the likelihood that a guide catheter will dislodge from the coronary artery’s opening. According to Teleflex, the claimed invention was conceived in early 2005 and developed under the “GuideLiner” name. The “rapid exchange” (RX) version of GuideLiner practices the challenged patents. An “over-the-wire” (OTW) version of GuideLiner was similar to prior art guide extension catheters and does not practice the challenged patents. The RX GuideLiner entered the market in 2009. Medtronic filed 13 petitions for inter partes review (IPR). five of which are consolidated in this appeal and asserted Itou as the primary prior art reference under pre-AIA 35 U.S.C. 102(e).The Federal Circuit affirmed the Patent Board, finding that Medtronic did not establish that the challenged claims were unpatentable. The claimed inventions were conceived by August 2005, before Itou’s filing date, and either actually reduced to practice for their intended purpose before that date, or were diligently worked on toward constructive reduction to practice on the challenged patents’ effective filing date. The intended purpose of the claimed inventions was to provide improved backup support for the guide catheter, so Itou did not qualify as prior art. View "Medtronic, Inc. v. Teleflex Innovations S.À.R.L." on Justia Law
Posted in:
Intellectual Property, Patents
OneSubsea IP UK Ltd. v. FMC Technologies, Inc.
FMC and OSS own patents that cover structures for subsea oil and gas recovery. OSS sued, alleging that FMC’s Enhanced Vertical Deepwater Tree equipped with FMC’s Retrievable Choke and Flow Module infringed 95 claims across 10 OSS patents. The infringement question in the suit boiled down to whether fluid flows through FMC’s accused device as required by the OSS Patents. Finding that OSS failed to raise a genuine issue of material fact regarding whether FMC’s accused devices met the “divert” limitations of the OSS Patents, the district court granted FMC summary judgment.FMC sought Attorneys’ Fees and Non-Taxable Costs under 35 U.S.C. 285, which applies to “exceptional cases.” FMC argued that the Markman Order foreclosed any legitimate diverter infringement claims going forward, making OSS’s litigation position on infringement objectively baseless and that the substantive weakness of OSS’s infringement claims is shown by OSS’s failure to produce any admissible evidence. FMC alleged litigation misconduct by OSS as unreasonably prolonging the case.Applying the Supreme Court's “Octane Fitness” test the district court denied FMC’s motion. The Federal Circuit affirmed, rejecting FMC’s arguments that OSS’s case was objectively baseless after the claim construction order and that rejection of OSS’s evidence demonstrated the substantive weakness of OSS’s case. OSS that it had no obligation to revise its litigation strategy just because the Patent Board had invalidated diverter claims in different patents. View "OneSubsea IP UK Ltd. v. FMC Technologies, Inc." on Justia Law
M.R. Pittman Group, LLC v. United States
The Army Corps of Engineers (USACE) solicited a contract for the repair of pumps in Louisiana. The webpage linking to the solicitation noted, “[t]his is a 100% Small Business Set Aside procurement" and cited NAICS Code: 811310--the official standard used to determine whether a business is a “small business concern.” The solicitation itself did not refer to Code 811310 but incorporated by reference Federal Acquisition Regulation 52.219-6, “Notice Of Total Small Business Set-Aside.” Pittman submitted the lowest bid. USACE requested that Pittman update its NAICS code status. Pittman did not qualify as a small business under Code 811310 and was ineligible for the award.Pittman filed a bid protest, arguing that the omission of Code 811310 meant that the solicitation could not be treated as a set-aside for small business concerns. The Government Accountability Office dismissed the protest. At a hearing, the parties discussed the "Blue & Gold" rule: A party who has the opportunity to object to the terms of a government solicitation containing a patent error and fails to do so before the close of the bidding process waives its ability to raise the same objection subsequently in a bid protest action. The court dismissed for lack of subject matter jurisdiction under Blue & Gold. The Federal Circuit affirmed. While waiver under Blue & Gold does not deprive the Claims Court of subject matter jurisdiction, the error was harmless because Pittman waived its objection. View "M.R. Pittman Group, LLC v. United States" on Justia Law
Posted in:
Government Contracts